Construction Package 16
Package No : CP-16
Name of EPC Contractors : M/s. Navayuga Engineering Company Ltd.
Length in Km: 37.000
LOA Issued date : 05.11.2018
Chainage details : Package 16, from Km. 664.479 to Km. 701.362 in section – Village Birwadi to Village Amne in District Thane
Name of Authority Engineers Consultant : M/s. Intercontinental Consultants & Technocrats Pvt. Ltd. J/v with Yuksel Proje Uluslararasi A.S. In Association with Streamline Infrastructure Pvt. Ltd.
LOA Issued date : 20.11.2018
Description
Scope
WIP
Completed
Major Structures
Flyover/Viaduct
05
05
–
ROB
01
–
–
Minor Structures
Minor Bridges
01
–
01
VOP
10
–
–
VUP
07
–
–
CUP and PUP
07
02
01
Box Culverts
21
11
02
Other Structures
Interchanges
02
–
–
Tannel
02
02
–
Total Structure
56
20
04
Activities
Scope
WIP
Completed
Balance
Clearing & Grubbing (C&G)
35.5
32.4
2.0
1.1
Embankment / Sub Grade Top (Emm-SG)
30.7
4.8
5.9
20.0
Granular Sub-Base (GSB)
30.7
1.0
13.8
15.2
Dry Lean Concrete (DLC)
30.7
0.0
12.3
17.7
Pavement Quality Concrete (PQC)
30.7
0.8
0.0
29.9